Key Info

A third-party test reports that MiniMax M3.1 Flash became 1.5x faster inside Atomic Agent, completing a Halloween-themed continuous 3D scene in 8 minutes.

Highlights

  • Atomic Fusion workflow split the task: a local Qwen 3.8 27B model wrote the plan, while MiniMax M3.1 Flash handled the coding.
  • The full 3D scene build finished in 8 minutes.
  • The post notes MiniMax M3.1 Flash is 1.5x faster in Atomic Agent than before.
  • Atomic Agent is offered as a free trial via the linked signup.